Menu

Concrete formwork blocks

Another technique. The same attention.

Concrete formwork blocks receive reinforcement and concrete. They differ from ordinary masonry blocks: reinforced-concrete continuity and connections to the base slab are specified by the pool design.

  • Permanent formwork blocks
  • Vertical and horizontal reinforcement
  • Concrete and openings coordinated
Site photograph supplied by Mohamed Piscine: blocks, reinforcement and service routes before the next concreting stages.
01

Courses and connections

The model shows block courses, cavities and connections to the base. It is illustrative; the blocks and reinforcement are specified for the actual project.

Site photograph supplied by Mohamed Piscine: blocks, reinforcement and service routes before the next concreting stages.
In this guide
02

Plan finishes early

Steps, openings, waterproofing and lining are defined together. We clarify these points before finalizing the quote and construction stages.

Site photo: concrete corner steps and platform before finishing. Each staircase is designed for its pool.
In this guide

Piscine Kachou advice

Your questions answered

Let's discuss your installation
Is it an ordinary block wall?

Formwork blocks are designed to receive concrete and reinforcement. Block choice and filling follow the system and pool design.

Can concrete steps be built?

Yes. Shape, risers, reinforcement, waterproofing and connection to the pool are designed together before execution.

Can tiles go directly onto the blocks?

Substrate preparation and waterproofing are specified before tiling. Blocks alone do not form the finishing system.

Piscine Kachou advice

An installation designed together.

Your wishes, your pool, your routine: let's discuss what suits your project.

Let’s talk pools.

Automated guide

How can we help?

Choose a topic or type your question.

Answers from our FAQsPrivacy
Speak with our team